First Floor Framing Complete

So, on Saturday morning Mack, Maureen and I went down to Anaheim to meet with the Design Center to choose our cabinets, counter tops, flooring and bathroom tile. We decided to add granite counter tops to the Master Bathroom and the downstairs bathroom (Bath #3). Also, we are going to have the fireplace surround done in the same granite, which will also match the kitchen counters. It was a productive morning and we were all very excited. After grabbing some lunch, we drove up to the construction site to see what had happened since the lumber was dropped off on Monday. Well, the first floor framing was essentially complete and we were excited to see the progress. If they can keep moving at such a rapid pace, we’ll be moving in no time. Take a look at the house page for more photos. We’ll be out at the site on next Sunday and will post another update, so check back soon.